{"id":1712,"date":"2026-11-23T10:54:35","date_gmt":"2026-11-23T10:54:35","guid":{"rendered":"https:\/\/dexa.co.ke\/blog\/?p=1712"},"modified":"2026-11-23T10:54:35","modified_gmt":"2026-11-23T10:54:35","slug":"container-depot-software-in-kenya","status":"publish","type":"post","link":"https:\/\/dexa.co.ke\/blog\/container-depot-software-in-kenya\/","title":{"rendered":"Container Depot Software in Kenya: In, Out and Demurrage"},"content":{"rendered":"<p><a href=\"https:\/\/dexa.co.ke\/blog\/telematics-software-in-kenya\/dexa-from-pickup-to-delivery\/\" rel=\"attachment wp-att-1569\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1569\" src=\"https:\/\/dexa.co.ke\/blog\/wp-content\/uploads\/2026\/10\/Dexa-From-Pickup-to-Delivery.png\" alt=\"Container Depot Software in Kenya\" width=\"1254\" height=\"1254\" srcset=\"https:\/\/dexa.co.ke\/blog\/wp-content\/uploads\/2026\/10\/Dexa-From-Pickup-to-Delivery.png 1254w, https:\/\/dexa.co.ke\/blog\/wp-content\/uploads\/2026\/10\/Dexa-From-Pickup-to-Delivery-300x300.png 300w, https:\/\/dexa.co.ke\/blog\/wp-content\/uploads\/2026\/10\/Dexa-From-Pickup-to-Delivery-1024x1024.png 1024w, https:\/\/dexa.co.ke\/blog\/wp-content\/uploads\/2026\/10\/Dexa-From-Pickup-to-Delivery-150x150.png 150w, https:\/\/dexa.co.ke\/blog\/wp-content\/uploads\/2026\/10\/Dexa-From-Pickup-to-Delivery-768x768.png 768w\" sizes=\"auto, (max-width: 1254px) 100vw, 1254px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/dexa.co.ke\">container depot software in Kenya<\/a> matters most at 06:45, when a queue of trucks reaches the gate before the yard clerk has finished the shift handover. Every box entering or leaving must be tied to a booking, a condition and a clock.<\/p>\n<p>A depot that tracks containers on paper can still function. It cannot tell a shipping line, three weeks later, why a forty-foot box was billed seven storage days instead of four. <a href=\"https:\/\/zama.co.ke\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> exists to answer that question with evidence.<\/p>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_86 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/dexa.co.ke\/blog\/container-depot-software-in-kenya\/#Gate-In_Records_That_Survive_a_Busy_Morning\" >Gate-In Records That Survive a Busy Morning<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/dexa.co.ke\/blog\/container-depot-software-in-kenya\/#The_Condition_Survey_at_the_Depot_Gate\" >The Condition Survey at the Depot Gate<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/dexa.co.ke\/blog\/container-depot-software-in-kenya\/#Yard_Positions_Mapped_to_Real_Rows\" >Yard Positions Mapped to Real Rows<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/dexa.co.ke\/blog\/container-depot-software-in-kenya\/#Storage_Days_Counted_From_the_Right_Timestamp\" >Storage Days Counted From the Right Timestamp<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/dexa.co.ke\/blog\/container-depot-software-in-kenya\/#Free_Time_and_the_Day_the_Clock_Turns\" >Free Time and the Day the Clock Turns<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/dexa.co.ke\/blog\/container-depot-software-in-kenya\/#Demurrage_Billing_Without_Manual_Arithmetic\" >Demurrage Billing Without Manual Arithmetic<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/dexa.co.ke\/blog\/container-depot-software-in-kenya\/#Repair_Estimates_Tied_to_Survey_Evidence\" >Repair Estimates Tied to Survey Evidence<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/dexa.co.ke\/blog\/container-depot-software-in-kenya\/#Release_Authority_Before_the_Truck_Arrives\" >Release Authority Before the Truck Arrives<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/dexa.co.ke\/blog\/container-depot-software-in-kenya\/#Gate-Out_Checks_and_the_Loaded_Container\" >Gate-Out Checks and the Loaded Container<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/dexa.co.ke\/blog\/container-depot-software-in-kenya\/#Empty_Returns_From_the_Consignees_Yard\" >Empty Returns From the Consignee&#8217;s Yard<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/dexa.co.ke\/blog\/container-depot-software-in-kenya\/#Disputes_Settled_With_Photographs_and_Timestamps\" >Disputes Settled With Photographs and Timestamps<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/dexa.co.ke\/blog\/container-depot-software-in-kenya\/#Weight_Limits_and_Overloaded_Trucks\" >Weight Limits and Overloaded Trucks<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/dexa.co.ke\/blog\/container-depot-software-in-kenya\/#Reefers_Plugs_and_Power_Failure_Logs\" >Reefers, Plugs and Power Failure Logs<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/dexa.co.ke\/blog\/container-depot-software-in-kenya\/#Dangerous_Goods_Segregation_in_the_Yard\" >Dangerous Goods Segregation in the Yard<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/dexa.co.ke\/blog\/container-depot-software-in-kenya\/#Subcontracting_Space_to_Another_Depot\" >Subcontracting Space to Another Depot<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-16\" href=\"https:\/\/dexa.co.ke\/blog\/container-depot-software-in-kenya\/#Daily_Stock_Count_Versus_the_System\" >Daily Stock Count Versus the System<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-17\" href=\"https:\/\/dexa.co.ke\/blog\/container-depot-software-in-kenya\/#Invoicing_Storage_to_the_Right_Party\" >Invoicing Storage to the Right Party<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-18\" href=\"https:\/\/dexa.co.ke\/blog\/container-depot-software-in-kenya\/#Month-End_Reports_the_Line_Agent_Trusts\" >Month-End Reports the Line Agent Trusts<\/a><\/li><\/ul><\/nav><\/div>\n<h2><span class=\"ez-toc-section\" id=\"Gate-In_Records_That_Survive_a_Busy_Morning\"><\/span>Gate-In Records That Survive a Busy Morning<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><a href=\"https:\/\/dexa.co.ke\">container depot software in Kenya<\/a> should capture the truck plate, driver, haulier, container number, size, type and booking reference at the gate. A partial record creates a container nobody can bill or release.<\/p>\n<p>The gate clerk should scan the container number rather than type it. One transposed digit turns a valid box into an orphan record that surfaces at month end.<\/p>\n<p>Weigh the truck or capture a verified weight before entry. Overloaded units damage yard surfaces and create a liability question the depot does not want.<\/p>\n<p><a href=\"https:\/\/pawa.co.ke\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> should check the booking before the truck is admitted. A container arriving for a line that has no allocation at this yard should wait outside, not occupy a slot.<\/p>\n<p>Record the exact gate-in time to the minute. Storage calculations, shift productivity and dispute evidence all depend on that single timestamp.<\/p>\n<p>Photograph the truck, the seal and the container doors at entry. Images taken in daylight at the gate are clearer than anything captured later in a crowded yard.<\/p>\n<p><a href=\"https:\/\/pms.co.ke\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> should issue a gate receipt the driver can sign or receive by message. The driver&#8217;s copy prevents an argument at the exit hours later.<\/p>\n<p>Distinguish a full import box from an empty awaiting positioning. They follow different storage rules, and mixing them inflates one account while hiding another.<\/p>\n<p>Close the gate-in only when the container has a physical yard location. An entry marked received with no slot sends the next truck on a search.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"The_Condition_Survey_at_the_Depot_Gate\"><\/span>The Condition Survey at the Depot Gate<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><a href=\"https:\/\/estateadmin.co.ke\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> should record condition at the point of receipt, before the box disappears into the stack. A survey completed the following week proves very little.<\/p>\n<p>Surveyors need a standard set of codes for dents, holes, bent rails, damaged twist locks and contaminated floors. Free text produces descriptions that cannot be compared or priced.<\/p>\n<p>Photograph each defect with the container number visible in the frame. Close-ups without context are easy to dispute and hard to audit.<\/p>\n<p><a href=\"https:\/\/churchesadmin.com\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> should separate damage that existed on arrival from damage found during storage or repair. The distinction decides who pays.<\/p>\n<p>Note the seal number and its condition before opening. A broken seal on an import unit is a customs matter, not a routine survey line.<\/p>\n<p>A survey should produce a repair estimate only when the damage affects fitness for carriage. Cosmetic marks on an empty box rarely justify a bill.<\/p>\n<p><a href=\"https:\/\/vega.co.ke\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> should let the haulier acknowledge the survey at the gate. A signature taken later, after the driver has left, carries less weight.<\/p>\n<p>Store the survey against the container history, not only the current visit. Repeated damage at the same corner suggests a handling problem worth investigating.<\/p>\n<p>A good survey protects the depot, the line and the consignee at once. It replaces three telephone arguments with one signed document.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Yard_Positions_Mapped_to_Real_Rows\"><\/span>Yard Positions Mapped to Real Rows<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><a href=\"https:\/\/dereva.co.ke\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> should model the yard as it physically exists: blocks, rows, bays and tiers. A single &#8220;in yard&#8221; status tells a forklift driver nothing useful.<\/p>\n<p>Number the positions on the ground and in the system using the same scheme. Repainting a row label without updating the software creates immediate confusion.<\/p>\n<p>Record the position at the moment of placement, not at the end of the shift. A box moved twice before being recorded may never be found on the first attempt.<\/p>\n<p><a href=\"https:\/\/jaat.co.ke\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> should show which positions are occupied, blocked or reserved for reefers. Yard density is a safety issue, not only a space issue.<\/p>\n<p>Allow a controlled move with a reason: inspection, repair, customs hold or reorganisation. Each move should leave a trail from the old position to the new one.<\/p>\n<p>Height limits matter. Stacking a light empty on a heavy loaded box may save space and create a crushing risk that no productivity figure justifies.<\/p>\n<p><a href=\"https:\/\/wito.co.ke\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> can suggest a position based on size, weight and expected dwell. The clerk should still confirm that the suggested slot is physically clear.<\/p>\n<p>Reserve lanes for equipment that must move quickly, such as units under customs supervision or reefers awaiting plug-in. A distant slot can cost more in handling than it saves in space.<\/p>\n<p>Reconcile the yard map with a physical count each week. Small drifts become a month of searching if nobody checks.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Storage_Days_Counted_From_the_Right_Timestamp\"><\/span>Storage Days Counted From the Right Timestamp<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><a href=\"https:\/\/awasam.co.ke\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> should count storage from the gate-in event that actually applies, not from a booking date typed by an office. The wrong start date changes every invoice that follows.<\/p>\n<p>For import boxes, storage usually begins at discharge or gate-in, depending on the agreement with the line. Store the rule per customer rather than assuming one practice.<\/p>\n<p>Count calendar days, not working days, unless the contract says otherwise. A Saturday gate movement still consumes a storage day at most depots.<\/p>\n<p><a href=\"https:\/\/saseni.co.ke\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> should show the start date, the free days applied and the first chargeable day on one screen. Anyone answering a client query needs that arithmetic visible.<\/p>\n<p>Handle the arrival of a container after the daily cut-off consistently. A box gated in at 18:10 may count from the next morning, but only if the tariff says so.<\/p>\n<p>Public holidays can suspend counting under some agreements. <a href=\"https:\/\/prim.co.ke\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> should hold a holiday calendar rather than relying on a clerk&#8217;s memory.<\/p>\n<p>Leap years, month ends and long weekends all produce disputes. A calculation engine beats a spreadsheet maintained by one person who eventually goes on leave.<\/p>\n<p>Record manual adjustments with a reason and an approver. An unexplained credit is indistinguishable from an error when the account is audited.<\/p>\n<p>Publish the storage statement before invoicing. A client who sees the days and the rate rarely argues about the total.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Free_Time_and_the_Day_the_Clock_Turns\"><\/span>Free Time and the Day the Clock Turns<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><a href=\"https:\/\/rentaldesk.co.ke\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> should store free time per shipping line, per contract and sometimes per cargo type. A single default will overcharge one client and undercharge another.<\/p>\n<p>Free time is often expressed in days from discharge, but the practical deadline can include the day of discharge. Clarify the convention in writing before the first invoice.<\/p>\n<p>Show the deadline as a date, not only a number of days. &#8220;Four days remaining&#8221; means little without the date the charges begin.<\/p>\n<p><a href=\"https:\/\/fama.co.ke\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> should warn the customer and the haulier as the deadline approaches. A message on the last free day is a courtesy; a message two days earlier is useful.<\/p>\n<p>Weekend expiry is a common trap. If free time ends on Sunday and the gate is closed, the client may need an extension confirmed on Friday.<\/p>\n<p>Extensions should be recorded as new terms with a source, not as deleted days. A line&#8217;s email granting two extra days is evidence only if it is attached.<\/p>\n<p><a href=\"https:\/\/spacekits.co.ke\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> can compare free time against the actual collection booking. A truck scheduled after expiry should trigger a conversation, not a silent charge.<\/p>\n<p>Some customers negotiate free time in exchange for volume. The system should apply the rate card that was active on the gate-in date, not the one signed later.<\/p>\n<p>The day the clock turns deserves a report of its own. Containers crossing into chargeable storage today are the ones a supervisor can still rescue.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Demurrage_Billing_Without_Manual_Arithmetic\"><\/span>Demurrage Billing Without Manual Arithmetic<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><a href=\"https:\/\/zamacore.com\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> should calculate charges from the tariff, the free period and the actual gate-out time. Manual arithmetic across hundreds of boxes invites both errors and suspicion.<\/p>\n<p>Tariffs often step up after a set number of days. Store the bands and apply them per container rather than averaging across a batch.<\/p>\n<p>Separate storage from demurrage where the contract distinguishes them. Even when the same office bills both, the client needs to see which charge belongs to which party.<\/p>\n<p><a href=\"https:\/\/mystayorbit.com\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> should produce an invoice line for each container with dates, days and rate. A single lump sum cannot be checked by the customer.<\/p>\n<p>Handle partial days consistently. Charging a full day for a box collected at 08:05 may be defensible, but only if the tariff states it.<\/p>\n<p>Credit notes need the same rigour as invoices. A waiver should link to the original charge, the reason and the person who approved it.<\/p>\n<p>Currency matters for lines billing in dollars while the depot collects shillings. Record the exchange rate and the date used on every converted invoice.<\/p>\n<p>A dispute should pause the collection process without deleting the charge. Suspending an invoice is a status, not an erasure.<\/p>\n<p>Reconcile billed storage against the gate records monthly. Any container billed without a matching movement is either a data error or a serious control failure.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Repair_Estimates_Tied_to_Survey_Evidence\"><\/span>Repair Estimates Tied to Survey Evidence<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><a href=\"https:\/\/dexa.co.ke\">container depot software in Kenya<\/a> should tie every repair line to the survey item that justified it. A workshop bill without a matching defect is a cost the line will challenge.<\/p>\n<p>Estimates need labour, materials and the time the box will be out of service. A cheap repair that blocks a position for ten days may cost more than the parts.<\/p>\n<p>Use a standard menu for common jobs: panel replacement, rail straightening, door gasket, twist lock, floor board. Free-form descriptions invite inconsistent pricing.<\/p>\n<p><a href=\"https:\/\/zama.co.ke\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> should separate owner-approved repairs from depot-required safety work. A leaking roof may need immediate attention, with the commercial discussion following.<\/p>\n<p>Photograph the repair before, during and after. The after image is what convinces a line that the work was completed rather than merely invoiced.<\/p>\n<p>Track repair turnaround by unit. A box that waits two weeks for a welder is not available for the next booking, and the schedule should reflect that.<\/p>\n<p><a href=\"https:\/\/pawa.co.ke\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> should show the estimated cost against the approved amount. Unapproved overspend is a dispute waiting for month end.<\/p>\n<p>Some damage is never economic to repair. Record the write-off decision, the authority behind it and the disposal route.<\/p>\n<p>A repair history follows the container for years. It should be portable when the box moves to another depot.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Release_Authority_Before_the_Truck_Arrives\"><\/span>Release Authority Before the Truck Arrives<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><a href=\"https:\/\/pms.co.ke\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> should hold the release authority for each container: who may collect it, on what basis and until when. A truck arriving without that check is a risk, not a customer.<\/p>\n<p>Release conditions usually include a cleared customs entry, a paid invoice and an original or telex bill of lading. Each condition should be visible as open or satisfied.<\/p>\n<p>A verbal release from a line agent is common in a hurry and dangerous in a dispute. <a href=\"https:\/\/estateadmin.co.ke\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> should require the authority to be recorded, even if it arrives by email.<\/p>\n<p>Check the collecting company against the release party. A transporter sent by the wrong clearing agent should be turned away politely at the gate.<\/p>\n<p>Release should generate a document with the container number, the authorised plate and a reference. The gate clerk can then compare paper with the screen.<\/p>\n<p><a href=\"https:\/\/churchesadmin.com\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> should block release when storage charges remain unpaid, unless a supervisor grants credit. The rule protects the depot without embarrassing a good customer.<\/p>\n<p>Partial release of a multi-container shipment needs its own control. Releasing two of three boxes against one authority should be explicit, not assumed.<\/p>\n<p>Record who verified the release and when. The name matters more than the tick when a container later disappears.<\/p>\n<p>Expire authorities after a set period. A release issued in March should not open a gate in June without a fresh confirmation.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Gate-Out_Checks_and_the_Loaded_Container\"><\/span>Gate-Out Checks and the Loaded Container<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><a href=\"https:\/\/vega.co.ke\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> should record the gate-out time, the truck, the driver and the condition at departure. The exit is the last chance to capture evidence.<\/p>\n<p>For a loaded export box, confirm the seal number against the shipping instruction. A mismatched seal can stop the container at the port gate.<\/p>\n<p>Photograph the sealed doors and the container number together. A picture of a seal alone proves nothing about which box it closed.<\/p>\n<p><a href=\"https:\/\/dereva.co.ke\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> should verify that the booking matches the departing unit. A box sent to the wrong terminal costs a full day and possibly a missed vessel.<\/p>\n<p>Check the weight against the permitted limit before the truck leaves. An overweight unit turned back at the port returns to the depot with a problem attached.<\/p>\n<p>Record any damage found at exit separately from entry condition. New damage between gate-in and gate-out is the depot&#8217;s responsibility to explain.<\/p>\n<p><a href=\"https:\/\/jaat.co.ke\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> should close the storage clock at the gate-out timestamp. A manual override should be rare and justified.<\/p>\n<p>Hand the driver a gate pass with the container number and time. That slip resolves most arguments at the port gate within minutes.<\/p>\n<p>A gate-out without a matching release is an exception. The system should raise it immediately, not during the nightly reconciliation.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Empty_Returns_From_the_Consignees_Yard\"><\/span>Empty Returns From the Consignee&#8217;s Yard<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><a href=\"https:\/\/wito.co.ke\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> should accept an empty return against the original issue record, not as a new container arriving from nowhere. The link between the two events protects the deposit.<\/p>\n<p>Inspect every empty at the gate, even when the haulier is impatient. Damage found after the truck leaves is difficult to attribute and expensive to recover.<\/p>\n<p>Return deadlines differ from import free time. A consignee may clear cargo promptly and still miss the empty return window by a week.<\/p>\n<p><a href=\"https:\/\/awasam.co.ke\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> should show which empties are overdue by line, by customer and by depot. A simple ageing list prevents a pile of daily penalties.<\/p>\n<p>Some depots accept returns only with a booking reference. Publish that rule to hauliers rather than turning trucks away at the gate.<\/p>\n<p>Record the condition and the position for every returned empty. A box placed in the wrong stack is lost for practical purposes until someone searches.<\/p>\n<p><a href=\"https:\/\/saseni.co.ke\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> should generate the return receipt the driver needs for the deposit claim. Without it, the finance team is chasing a document that never existed.<\/p>\n<p>Cleaning, fumigation and minor repairs may be needed before the empty can be reissued. Track those tasks as part of the return, not as an afterthought.<\/p>\n<p>Reconcile returned empties against the line&#8217;s equipment inventory. A missing unit is either a data gap or a serious loss.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Disputes_Settled_With_Photographs_and_Timestamps\"><\/span>Disputes Settled With Photographs and Timestamps<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><a href=\"https:\/\/prim.co.ke\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> should assemble the evidence for a dispute in one view: gate times, surveys, photographs, invoices and correspondence. Rebuilding that pack from four systems takes days.<\/p>\n<p>A consignee disputing seven storage days needs the discharge date, the free-time rule and the gate-out record. Each should be attached, not described.<\/p>\n<p>Photographs need timestamps and container numbers. An image file named &#8220;damage&#8221; proves little when two similar boxes were handled the same morning.<\/p>\n<p><a href=\"https:\/\/rentaldesk.co.ke\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> should keep the original survey even after a repair is approved. The record of what was found is separate from the record of what was fixed.<\/p>\n<p>Disputes often turn on who said what. Store the line&#8217;s extension email against the charge it affects, not in a general inbox.<\/p>\n<p>Offer a clear response path. A client should see the evidence, the charge basis and the person reviewing the case within one working day.<\/p>\n<p><a href=\"https:\/\/fama.co.ke\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> can show whether a disputed charge is still accruing. Freezing the clock without recording why creates a second argument later.<\/p>\n<p>Resolve or escalate within a stated period. An open dispute that drags for months damages the relationship more than the amount involved.<\/p>\n<p>Learn from repeat disputes. If the same tariff clause is challenged every month, the wording needs fixing.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Weight_Limits_and_Overloaded_Trucks\"><\/span>Weight Limits and Overloaded Trucks<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><a href=\"https:\/\/spacekits.co.ke\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> should hold the maximum gross weight for each container type and check it at gate-in and gate-out. An overloaded unit is a road safety matter before it is a commercial one.<\/p>\n<p>Weighbridge readings should attach to the gate record with the time and the equipment used. A declared weight typed by a clerk is not a measurement.<\/p>\n<p>Axle limits matter on Kenyan roads. A truck may be legal on total weight and illegal on an axle, which puts the haulier at risk on the weighbridge.<\/p>\n<p><a href=\"https:\/\/zamacore.com\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> should flag a container whose cargo weight plus tare approaches the limit. That warning helps the shipper correct the packing list before the port.<\/p>\n<p>Record the action taken when an overweight unit is refused. Turning a truck away without a note leaves the next shift guessing.<\/p>\n<p>Some imbalances come from poor stuffing rather than excess cargo. A note on the survey can prompt a restack instead of a rejection.<\/p>\n<p><a href=\"https:\/\/mystayorbit.com\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> can compare declared weight against the verified figure and highlight repeated offenders. Patterns are more useful than individual arguments.<\/p>\n<p>Coordinate with the haulier before the truck departs. A phone call at the yard gate is cheaper than a failed trip to Mombasa.<\/p>\n<p>Keep the evidence even when the truck is allowed to proceed. A later accident investigation will ask what the depot knew.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Reefers_Plugs_and_Power_Failure_Logs\"><\/span>Reefers, Plugs and Power Failure Logs<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><a href=\"https:\/\/dexa.co.ke\">container depot software in Kenya<\/a> should record each reefer&#8217;s set point, actual temperature and plug position at gate-in. A temperature argument without that baseline is settled by whoever shouts loudest.<\/p>\n<p>Reefer slots are scarce and must be reserved, not discovered. A box arriving without a working plug may need a generator, and that cost belongs on the file.<\/p>\n<p>Log every plug-in and plug-out event with a time. The gap between them is the period the depot is responsible for.<\/p>\n<p>Temperature readings should be captured at fixed intervals and retained. A single morning check cannot explain an overnight excursion.<\/p>\n<p><a href=\"https:\/\/zama.co.ke\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> should record power interruptions, generator starts and the technician who responded. A line will ask for that log before accepting any claim.<\/p>\n<p>Alarms need an owner and an escalation path. A high-temperature alert at 02:00 should reach someone who can act, not wait for the day shift.<\/p>\n<p><a href=\"https:\/\/pawa.co.ke\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> should hold a pre-trip checklist for every reefer. Store the result against the unit so the next depot does not repeat the work.<\/p>\n<p>Do not let a reefer sit unplugged while paperwork is completed. The cargo clock runs from the moment the box leaves the vessel.<\/p>\n<p>Close the reefer file only when the unit is collected or reissued, with the final temperature recorded.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Dangerous_Goods_Segregation_in_the_Yard\"><\/span>Dangerous Goods Segregation in the Yard<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><a href=\"https:\/\/pms.co.ke\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> should hold the dangerous goods class for every unit and enforce separation rules in the yard map. A visual check by a tired clerk is not a segregation policy.<\/p>\n<p>Class labels, UN numbers and packing group details belong in the record. A container marked only as &#8220;chemicals&#8221; gives the yard team nothing to work with.<\/p>\n<p>Segregation distances depend on the classes involved. The system should block a suggested position that breaches the required gap.<\/p>\n<p><a href=\"https:\/\/estateadmin.co.ke\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> should require an approved storage location before a dangerous goods unit is admitted. Emergency admissions need a supervisor&#8217;s decision and a note.<\/p>\n<p>Keep the emergency response information attached to the container. The fire team should not be searching for a document while a leak is spreading.<\/p>\n<p>Inspect dangerous goods units more frequently than general cargo. The survey interval should be a rule in the system, not a habit of one supervisor.<\/p>\n<p>The record should show which staff are trained for dangerous goods handling. Assigning an untrained clerk to a class three unit is a safety failure.<\/p>\n<p>Report incidents and near misses in the same place as the container record. Patterns across months are easy to miss when notes live in a notebook.<\/p>\n<p>Audit segregation monthly against the physical yard. A software rule that nobody verifies slowly becomes decoration.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Subcontracting_Space_to_Another_Depot\"><\/span>Subcontracting Space to Another Depot<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><a href=\"https:\/\/churchesadmin.com\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> should record when a container is held at a partner yard, with the partner name, position and transfer date. Ownership of the box does not follow it through the gate.<\/p>\n<p>Partner storage rates need to sit beside your own. A box parked elsewhere for convenience can erase the margin on the whole account.<\/p>\n<p>Transfer documents should travel with the container. A gate pass without a survey simply moves the dispute to a different yard.<\/p>\n<p><a href=\"https:\/\/vega.co.ke\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> should show the partner&#8217;s reported stock against your own expectation. Differences found early are usually paperwork; differences found late are often losses.<\/p>\n<p>Agree who handles repairs at the partner site and who approves the cost. Shared responsibility without a rule becomes nobody&#8217;s responsibility.<\/p>\n<p>Insurance cover may not follow a subcontracted unit automatically. Confirm the position before the truck leaves your gate.<\/p>\n<p>Partner dwell should enter the customer&#8217;s storage calculation only where the contract allows it. Double charging is difficult to defend.<\/p>\n<p>Reconcile partner invoices against the transfer records each month. A charge for a container you never sent is a signal worth following.<\/p>\n<p>Review the arrangement quarterly. A partner who was convenient in a shortage may be expensive in a normal week.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Daily_Stock_Count_Versus_the_System\"><\/span>Daily Stock Count Versus the System<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><a href=\"https:\/\/dereva.co.ke\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> should produce a count sheet by block and position each morning. A total number for the whole yard cannot be reconciled against anything.<\/p>\n<p>Count in the same sequence every day. Random routes hide the positions that are consistently wrong.<\/p>\n<p>Record the count time and the counter. A discrepancy found at 07:00 is easier to investigate than one discovered at month end.<\/p>\n<p><a href=\"https:\/\/jaat.co.ke\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> should compare counted units against expected units by position, not only by total. Two compensating errors can leave a perfect total and a broken yard.<\/p>\n<p>Investigate every miss the same day. A container found in the wrong row is a training issue; one that cannot be found is a commercial emergency.<\/p>\n<p>Photograph unexplained gaps in the stack. The image helps the next shift understand what changed.<\/p>\n<p>Track count accuracy as a measure over time. A yard at ninety-eight percent is healthy; ninety percent is a search party.<\/p>\n<p>Feed count results into the storage and release process. A box marked released but still physically present should block the next booking.<\/p>\n<p>Keep a log of adjustments with reasons. An unexplained correction is the beginning of a control problem.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Invoicing_Storage_to_the_Right_Party\"><\/span>Invoicing Storage to the Right Party<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><a href=\"https:\/\/wito.co.ke\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> should know who pays for storage before the first day accrues. The line, the consignee and the clearing agent are not interchangeable.<\/p>\n<p>Contract terms decide the payer. A merchant haulage box may sit on the consignee&#8217;s account while a carrier haulage unit stays with the line.<\/p>\n<p>The invoice should name the container, the period and the tariff used. A summary charge across forty boxes is impossible for a customer to verify.<\/p>\n<p><a href=\"https:\/\/awasam.co.ke\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> should hold the customer&#8217;s tax details and purchase order reference. A correct invoice rejected for a missing PIN delays payment for weeks.<\/p>\n<p>Split invoices where the contract requires it. One consolidated bill sent to the wrong entity can age for ninety days while everyone denies ownership.<\/p>\n<p>Credit terms should reflect the actual agreement. The system can flag an account approaching its limit before a release is blocked at the gate.<\/p>\n<p>Handle recharges to the haulier where waiting time caused the extra day. That conversation is easier with the gate timestamps attached.<\/p>\n<p>Keep a clear separation between storage, repairs and handling. A single line called &#8220;charges&#8221; invites a dispute about all three.<\/p>\n<p>Send statements monthly, not only when a balance is overdue. Customers pay faster when the arithmetic is familiar.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Month-End_Reports_the_Line_Agent_Trusts\"><\/span>Month-End Reports the Line Agent Trusts<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><a href=\"https:\/\/saseni.co.ke\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> should close the month with a stock reconciliation, a storage summary and an exceptions list. Three reports that agree are worth more than twenty that do not.<\/p>\n<p>The stock report should start with opening units, add gate-ins, subtract gate-outs and end with closing units by container type. Any unexplained difference needs a note.<\/p>\n<p>Storage summaries should show billed days, free days and chargeable days by customer. A line agent will check a sample, so the sample must survive scrutiny.<\/p>\n<p><a href=\"https:\/\/prim.co.ke\" target=\"_blank\" rel=\"noopener\">container depot software in Kenya<\/a> should separate revenue from cash collected. A strong billing month with weak collection is not a good month.<\/p>\n<p>Repair reports need the survey reference and the approval status. Unapproved repairs inflate revenue on paper and create credit notes later.<\/p>\n<p>List containers still in the yard beyond a threshold. The ageing report is the earliest warning of a demurrage dispute or a lost unit.<\/p>\n<p>The line agent should be able to export the data rather than request a custom spreadsheet. Self-service reduces the daily email load on your team.<\/p>\n<p>Reconcile the report against the general ledger before release. A difference found by the auditor is more expensive than one found internally.<\/p>\n<p>Sign off the month with a named preparer and reviewer. The signature is not ceremony; it is the point at which the numbers become the depot&#8217;s official position.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>container depot software in Kenya matters most at 06:45, when a queue of trucks reaches the gate before the yard clerk has finished the&hellip;<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,3,4],"tags":[],"class_list":["post-1712","post","type-post","status-publish","format-standard","hentry","category-uncategorized","category-courier-management-software","category-courier-management-system-cost"],"_links":{"self":[{"href":"https:\/\/dexa.co.ke\/blog\/wp-json\/wp\/v2\/posts\/1712","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dexa.co.ke\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dexa.co.ke\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dexa.co.ke\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/dexa.co.ke\/blog\/wp-json\/wp\/v2\/comments?post=1712"}],"version-history":[{"count":1,"href":"https:\/\/dexa.co.ke\/blog\/wp-json\/wp\/v2\/posts\/1712\/revisions"}],"predecessor-version":[{"id":1715,"href":"https:\/\/dexa.co.ke\/blog\/wp-json\/wp\/v2\/posts\/1712\/revisions\/1715"}],"wp:attachment":[{"href":"https:\/\/dexa.co.ke\/blog\/wp-json\/wp\/v2\/media?parent=1712"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dexa.co.ke\/blog\/wp-json\/wp\/v2\/categories?post=1712"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dexa.co.ke\/blog\/wp-json\/wp\/v2\/tags?post=1712"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}